Shortening construction period and cost reduction "Ogawa-kun Entrance Drainage Unit (GS)"
Elimination of entrance step, shortening of construction period, cost reduction.
- The step at the entrance has been eliminated, allowing wheelchairs to pass smoothly. It does not deform even when heavy objects are placed on it (load capacity 9.0 kN). - The top lid, main body, and drainage outlet are integrated into a unit, making installation and maintenance easy (shortened construction time and cost reduction). - The gap is less than 6 millimeters. - The main body has a slope, allowing for smooth drainage (for 150 square tiles; the side outlet specification and custom products do not have a slope). - The back side is made of resin material, preventing slipping and noise from footsteps.
- Company:シマブン
- Price:10,000 yen-100,000 yen